Block 4 Progress   Leave a comment

Tour of Block 4: From the stairs, you see a large open classroom. Enter, and you see a small hallway towards the street. On the right is a second large classroom, with a storage closet and window facing the street, plus another window facing the hallway (in this room, children will enjoy a variety of classes: computation, English, arts and crafts, Bible study, etc). On the other side of the hall is a dorm room, which also has a window that faces the street. We are hoping to house a needy child there. Returning, you pass the boys´ and girls´ bathrooms (3 small rooms each–sink, toilet, shower).

Where the electricity wiring will go on the walls has been cut–we must have ceilings to be able to complete the wiring. This week, the walls will be completed, and doors are being made. When we have donations for the ceiling, we will finish Block 4. It also needs to be painted. But the open classroom is already in use for Club on Sundays.

Advertisements

Posted February 6, 2011 by Seeds of Love in seeds

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: